docs(log): ceiling-cut entry closes with the green 33/33 gate
This commit is contained in:
@@ -1999,6 +1999,10 @@ every restart since the cutover.
|
||||
401 / plain-HTTP empty reply, which is what Plex Web authenticates against),
|
||||
and the guard contract is still asserted for every vhost: challenge cleared, no
|
||||
authentik `uidField`, status < 500. Both symptoms recorded as gotcha 6.
|
||||
- Gate after both fixes: **33 passed (1.2 m)**, crawl green on the first attempt
|
||||
(6.5 s) — the earlier `DEPLOY INCOMPLETE` is cleared, and the deploy marker
|
||||
stays at `7c4dbeb` because every later commit is docs/tests only, which the
|
||||
planner treats as a no-op for the service.
|
||||
- Cost of the cut: two maximum-length conversations never coexist (one
|
||||
200,704-position pool behind both slots; two of ≤100k still do). Bought: 1.7
|
||||
GiB back as page cache for the 47.68 GiB n-gram table — 9.1 GiB against the
|
||||
|
||||
Reference in New Issue
Block a user