Files
serverAppConfigs/scripts
Frank 06a9cb60eb docs(frank-zealot): PTQ1_0 was ordered, measured and approved — not an unfinished arm
Frank's 02:36 instruction (archive 01a14c93) ordered the 27B PTQ1_0 arm at
2 x 200,704 with the Q8 mmproj and batch/ubatch 3072/1536; it served
production 03:14:39-03:38:57 (pid 191358, journal type ptq1_0: 402 tensors).
Recovered its numbers from that process's own print_timing lines: ~48 t/s
single-stream decode, 25-27 t/s per stream at two streams, prefill 1,295 t/s
at 30,637 -> 943 at 97,856 -> 801 at 141,365. It bought the promised 1,201 MiB
and lost 37% of decode against the PQ2_0 record, so the publisher's Ampere
warning generalizes to GA102; Frank scratched the 27B plan at 03:33 for the 9B.

Every 'unfinished experiment' claim is re-keyed, and the AGENTS.md law gains
the durable lesson: a bench verdict that never reaches the repo is
indistinguishable from a rogue arm.
2026-10-18 13:50:19 -07:00
..