The full-suite re-run after the reset fix came back "1 flaky": 12-crawl reached
plex.franksdank.cloud, the guard cleared, and Plex Web — signed out in the
qa-e2e profile — handed the browser to its own hosted sign-in surface, so the
hostname never settled on the vhost (60 s poll, Expected plex.franksdank.cloud /
Received app.plex.tv). settleThroughGuard now takes a HANDOFFS landing list per
vhost; only plex.franksdank.cloud gets one, every other host still has to land on
its own vhost, and the guard assertions (Anubis cleared, no authentik uidField,
status < 500) are unchanged. Worklog and E2E gotcha 6 carry both symptoms: the
ERR_ABORTED reset and the hand-off.
Two faces of the same verification round.
12-crawl returned to the homepage between links with a bare page.goto, and Plex
Web (signed out, so it renders its own sign-in iframe for its Plex-account flow)
keeps redirecting the top frame: Chromium cancelled our goto with
net::ERR_ABORTED, outside the try, so the whole crawl died — once as a 420 s
timeout in the deploy gate, once at 5.4 s on the same link. backHome() tolerates
that one error class and re-issues; any other error still propagates, and the
per-app verdict (guard settled, hostname, no authentik uidField, status < 500)
is unchanged. Plex was healthy throughout (container up 2 days, 32400 answering
HTTPS 401 / plain-HTTP empty reply), so this was app behaviour, not a fault —
recorded as gotcha 6 on the E2E page.
The 200,704 boot printed 5.5 GiB reserved and 74.1 GiB in all (not the ~5.4/~74
my arithmetic predicted), so every prose figure is re-keyed to the ledger, and
the runbook gains the second production-boot section: marker revision, pool
reservation, shape line, prompt-cache entry size, and the refusal contract at the
new ceiling (400 in 0.86 s naming 200704 and the 96,405-token overage, before any
prefill). Cost stated (two maximum-length conversations never coexist; the 180k
compaction target is unreachable inside a 155,648 window) and purchase stated
(1.7 GiB of page cache, 9.1 GiB against the 2026-10-06 shape).
The 17:47 Ornith-1.5-9B swap (77decb5) updated frank-small.env and
serve-frank-small.sh but left two consumers on the MiMo-Q6K paths:
deploy-remote.sh's LLM_SMALL_MODEL_FILE/LLM_SMALL_MMPROJ defaults (the
payload-existence gate checked files the unit no longer loads) and
frank_small_unit.bats (stubs + env assertion), which held the whole
bats suite red. Both now point at the Ornith-Q8 payload; docs updated
with the conditional frankbook e2e project.