Commit Graph
4 Commits
Author SHA1 Message Date
Frank 90c4ac69a7 Doc audit: fix all broken links + correct stale facts across the KB
Fanned out 5 read-only doc-auditor subagents (one per service group) that
fact-checked the knowledge base against the live system + repo config,
researched official setup docs online, and verified progress. Applied:
- All 34 broken links fixed (real pages / external URLs / correct relative
  paths); 0 broken links remain. No .AGENTTRASH links (the 4 mentions are
  accurate descriptive text, not links).
- Fact-check fixes: Readarr retired (May 2026), Radarr v4->v6, Calibre
  9.2.1 live, Calibre-Web 0.6.25 live, Copyparty v1.20.21, LLM index
  ncmoe 38 + 786432 ctx, frank-default-small active (not frank-pp-worker),
  Hermes/SearXNG/Grafana hostnames, Loki/Alloy local images, Observability
  diagram (Promtail->Alloy), VLLM retired note, DFlash status, benchmark
  live-drift notes, Homepage test count 116.
2026-08-24 01:10:44 -07:00
Frank cc1f421d27 Homepage: record the completed build in the KB
- Homepage.md: status is now 'built, pending deploy' (all assets + checker +
  deploy are in the repo, 112 tests green). To go live: add CADDY_ADMIN_HASH
  to the target .env, then deploy.sh.
- Homepage Design Grilling.md: the build is complete (all 6 slices, full TDD);
  the only remaining step is the operator adding the admin hash + deploying.
- pi log.md: build-complete entry.
2026-08-23 13:06:58 -07:00
Frank e430b6dbad Homepage: record all 38 settled decisions (grilling complete)
- Homepage Design Grilling.md: final decision table (Q1-Q43) + the deltas where
  the operator changed the recommendation (per-service probe method, 5s timeout,
  TUI panels, toggleable styling, no cursor alteration, no auto-refresh, /docs/
  path, user-facing docs, git-driven deploy, full TDD, last-deploy footer).
- Homepage.md: updated to the settled design (per-service probe, 5s, TUI panels,
  styling toggle, no auto-refresh, /docs/ workstream, git-driven deploy, TDD).
- pi log.md: 2026-08-23 entry recording the settled design and build order.

Build order is unblocked. No homepage code built yet.
2026-08-23 10:31:15 -07:00
Frank cdae928f37 Homepage: settle design (grilling Q1-Q5), log open questions Q6-Q43, progress report
- Homepage.md: rewritten to the settled design (single site, user + /admin/
  pages, server-side status.json via a 3-min systemd-timer checker, terminal
  TUI theme). Added mermaid diagrams: site structure, status states, checker
  flow. Recorded the classification (user vs admin; *arr excluded; LLM admin;
  backends status-only) and the documented future shift to client-side probing.
- Homepage Design Grilling.md (new): the decision log — settled Q1-Q5 plus 38
  open questions (Q6-Q43) across 10 categories, each with a recommendation.
- docs/index.md: link the grilling page (satisfies the index-links-every-page test).
- report/homepage-grilling-2026-08-22.html: self-contained terminal-TUI progress
  report (settled decisions, verified stack baseline, overnight processing, work
  threads, the open questions, and how to continue).

Baseline recorded: Dankclaw fully up (10/10); the Dankserver media stack is down
(only Calibre-Web + the LLM are up; no .env on the target) — a separate thread.
No homepage code built yet; the design is pending the operator's answers to Q6-Q43.
2026-08-23 02:59:48 -07:00